| Structure | Type of Building | Pre-engineered building from reputed manufacturer |
| Height of Warehouse | 12m at Eave | |
| Pitch of roof | 1:20 slope | |
| Roofing | 0.6mm Bare-galvalume standing seam roof | |
| Cladding (Side walls) | 0.5mm Colour coated | |
| Insulation | 8mm Air bubble insulation | |
| Crane Provision | 10 MT (Provision) | |
| Wall height | 3m high brick wall from Floor level | |
| Natural lighting | 3% of Roof | |
| Ventilation | Natural Ventilation through Roof monitor | |
| Docking | Main docking from Single side for better utilisation of Space | |
| Minor docking all around warehouse | ||
| 27m of Apron available in front of major docking | ||
| 1.2m (4FT) high to maintain easy loading/unloading | ||
| Fire Escape | Steel Doors with Panic bar as per norms | |
| Staircases to the road level/ground level with MS painted handrails | ||
| Flooring | VDF flooring with Trimix Finish | |
| 5 MT/m2 Capacity | ||
| Toilet | Toilet for Works with proper facility | |
| Electrical Works | Three phase power supply at tap-off point | |
| Power will be provided at the rate of 10 watts per sq. mtr | ||
| Firefighting System | Tap-off points for the hydrant system | |
| System tap off for roof sprinkler system (Provision) | ||
| Common Facility | Truck Parking | |
| Weigh Bridge | ||
| Sewage treatment Plant | ||
| RCC road with Proper Drainage system | ||